Quote

From:

8925 15th ave
Brooklyn NY 11228

AnthonyA@mos-tech.com

Quote Number QUO-8
Quote Date January 15, 2020
Total $41,430.00
To:
George Arab

Start date: 20/1/7

1/7 Move furniture, prep for job & clean buildings

1/8 Move furniture & Demo, doc

1/9 Demo and clean up

1/13 Demo and prep for garbage removal

1/14 Garbage removal and demo

1/15 Demo, cut pipe tunnel, garbage removal

1/16 Framing and clean up

Garbage Removal and Pipe removal

 

Hrs/Qty Service Rate/PriceSub Total
4 Furniture Moving
$125.00$500.00
25 Demo and garbage

Per cube yrd
Remove: Kitchen/Livingroom Walls, Kitchen Ceiling, Kitchen Closet, Kitchen Cabinets, Kitchen Closet, Bathroom walls tiled (5), Bathroom Floor, Shower, Bedroom tile floor, Plaster Ceiling Sections, Drop Ceiling Tiles and Frame

$300.00$7,500.00
6 Plumbing: Pipe terminations

Terminate Kitchen Sink, Bathroom Sink, Toilet, Shower. Sewer Vent Lines

$150.00$900.00
30 Framing

Repairs, Kitchen/Bathroom Wall. Bathroom walls (4), Bathroom Ceiling, Bathroom Floor, Bedroom Floor,

$200.00$6,000.00
416 5/8" drywall - hung, taped
$5.00$2,080.00
350 Flooring: Moderate Condtions

Does not Include Price of material

$16.00$5,600.00
400 Paint: Walls
$3.00$1,200.00
350 Paint: Ceiling
$1.50$525.00
0 Plaster Repair
$0.00$0.00
6 Plumbing: Water lines repiping
$150.00$900.00
12 Plumbing: Waste line and ventinf
$150.00$1,800.00
10 Plumbing: Water lines; Bathroom sink, shower, kitchen sink
$150.00$1,500.00
65 Kitchen Remodel
$125.00$8,125.00
60 Bathroom Remodel

Install new Shower, toilet, Bathroom Sink, Kitchen Sink

$80.00$4,800.00
Sub Total $41,430.00
Fees $0.00
Total $41,430.00

Add a comment